TM-9-2320-387-24-2

TRUCK, UTILITY: S250 SHELTER CARRIER, 4X4, M1113

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE, VOLUME 2

DECEMBER 1997
CHANGE 1

  TM-9-2320-387-24-2 - Page 1114 of 1555

TM 9-2320-387-24-2
28- 17. CONTROL VALVE AND ACCUMULATOR HOUSING REPAIR (Cont’d)
I
8.
Install spring (14) and 2-3 shift valve (13) in body (2) with spring pin (12). Install 2-3 shift
solenoid (11) with capscrew (10).
9.
Install spring (3),3-4 shift valve (41, O-ring seal (5), bushing (6), ball (7), and plug (8) in body (2)
with spring pin (9).
10.
Install manual valve (30) in body (2).
11.
Install screen filter (1) in body (2).
28-63


Back to Top