TM-9-2320-387-24-2

TRUCK, UTILITY: S250 SHELTER CARRIER, 4X4, M1113

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE, VOLUME 2

DECEMBER 1997
CHANGE 1

  TM-9-2320-387-24-2 - Page 1228 of 1555

TM
9-2320-387-24-2
32-6. RIGHT INTERMEDIATE BODY MOUNT BRACKET REPLACEMENT
I
This task covers:
a.
Removal
b.
Installation
INITIAL SETUP:
TOOIS
General mechanic’s tool kit:
automotive (Appendix B, Item 11
Materials/Parts
Sealing
compound
(Appendix
C, Item 71)
Manual References
TM 9-2320-387-24P
Equipment
Condition
Right intermediate body mount removed
(para. 33-3).
Maintenance
Level
General
support
1
a. Removal
1
Remove
three
capscrews
(l), washers
(21, and bracket
(3) from frame
rail (4).
-1
Apply sealing compound to three capscrews (11 and install bracket (3) on frame rail (41 with three
washers (2) and capscrews (1). Tighten capscrews (11 to 65-87 lb& (88-118 N-ml.
FOLLOW-ON TASK: Install right intermediate body mount (para. 33-31.
32-12


Back to Top