OPERATOR MAINTENANCE
TOW SPADE INSTALLATION/REMOVAL
INITIAL SETUP:
Personnel Required
Operator and Assistant - - - (2)
SET UP TOW SPADES
NOTE
This procedure is a two soldier task.
1.
Prepare crane for operation with remote controls. (WP 0107)
2.
Remove two extension adapters (1) from stowage.
TM 9-2320-431-10-1
0108
0108-1