RAISE AND LOWER LOAD
WARNING
Ensure area is clear of personnel prior to moving SWING lever. Boom
should be swung slowly enough so crane operator has complete control.
Failure to comply may result in injury or death to personnel.
CAUTION
•
Do not let cable become slack. Cable may get tangled on drum and
damage cable.
•
Do not drag load sideways on ground. Dragging load could cause
damage to crane.
1.
Operate SWING control lever (1) and center end of boom (2) directly over load.