Figure 2.
2.
Fully raise mast.
3.
Shut down operation and leave mast in raised position overnight.
4.
Start engine. (Volume 1, WP 0044)
5.
Prepare vehicle for crane operations.
NOTE
When starting operations, operate mast control down (not up) first.
Operating controls UP could force air back into cylinders.
TM 9-2320-431-10-2
0163
0163-4