Table 1.
PMCS - DURING - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
Keep boom clear of all elec-
trical lines and other obsta-
cles while operating crane.
Failure to comply may result
in injury or death to personnel.
CAUTION
Do not let cable become slack
or cable may get tangled on
drum.
(3) Move HOIST control
lever to UP position to
take up cable. Move
BOOM control lever to
UP position to raise
boom.
Cable does
not reel in or
boom does
not raise.
HOIST
CONTROL LEVER
BOOM
CONTROL LEVER
BOOM
Figure 26.
(4) Move HOIST control
lever to DOWN position
to pay out cable. Move
Cable does
not pay out
or boom
TM 9-2320-431-10-2
0183
0183-39