Table 1.
PMCS - DURING - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
DOWN position to pay
out cable.
HOIST
CONTROL LEVER
TELESCOPE
CONTROL LEVER
CABLE
Figure 27.
(6) Move HOIST control
lever in UP position to
reel in cable.
Cable will
not reel in.
TM 9-2320-431-10-2
0183
0183-41