Table 1.
PMCS - WEEKLY - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
NOTE
For more information on ma-
terial handling crane operat-
ing instructions, refer to grove
crane operation (manual con-
trol) procedures. (Volume 1,
WP 0106)
2. Check that crane hydraulic
system is operable as follows:
a. Start engine. (Volume 1,
WP 0044)
b. Set PTO ENGAGE switch to
ON position. PTO indicator
light will illuminate.
TM 9-2320-431-10-2
0185
0185-38