TM-9-2320-432-10

TRUCK, CARGO, 8X8, M985

TECHNICAL MANUAL; OPERATOR'S MANUAL

JUNE 2009

  TM-9-2320-432-10 - Page 281 of 1076

SHUTDOWN CRANE - Continued
NOTE
Operate control lever with light, even pressure.
TELESCOPE and HOIST control levers should be operated at same
time to keep hook block at least 2 ft. (0.61) from end of boom.
Crane movement from one lever may be slower than the other when
operating levers together.
4.
Move TELESCOPE control lever (4) to IN position to pull boom extensions (5) in and
move HOIST control lever (6) to UP position to reel in cable (7) until all boom
extensions (5) are fully retracted.


Back to Top