TM-9-2320-434-10

TRUCK, LOAD HANDLING SYSTEM (LHS), 8X8, M1120

TECHNICAL MANUAL; OPERATOR'S MANUAL

JUNE 2009

  TM-9-2320-434-10 - Page 719 of 1324

WINCH MIRED VEHICLE FORWARD - Continued
When pulling cable through tensioning device, push sheave towards
frame rail to allow clevis to pass through.
15.
Pay out cable (9) while assistant pulls cable (9) until it is 6 in. to 1 ft. (15 cm to 30 cm)
past the front roller guide (12).
13
9
13
M977 SHOWN
15
14
9
12
Figure 8.
16.
Stop paying out cable (9).
17.
Assistant routes cable (9) through cable guide (13), over sheave (14), between roller
(15), and side of cable guide (13).
18.
Pay out winch cable (9) as assistant routes cable over first axle and 1 ft. (30 cm) past
front roller guide assembly (12).
TM 9-2320-434-10
0099
0099-7


Back to Top