TM-9-2320-435-10

TRUCK, COMMON BRIDGE TRANSPORT (CBT), 8X8, M1977

TECHNICAL MANUAL; OPERATOR'S MANUAL

JUNE 2009

  TM-9-2320-435-10 - Page 1017 of 1168

Table 1.
PMCS- SEMIANNUAL - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
out of com-
ponent.
4. Lubricate tie rod ends with GAA.
(WP 0154, Table 8)
Fitting will
not purge
old lubricant
out of com-
ponent.
5. Lubricate steering linkage U-
joints and shafts with GAA.
(WP 0154)
Fitting will
not purge
old lubricant
out of com-
ponent.
NOTE
The top trunnion bearing
should be given 10 to 12
strokes with a grease gun
through existing fitting.
The plug below the
bottom should
temporarily be removed
and a grease fitting
installed. The lower
trunnion bearing should
be lubricated with 10 to
12 strokes from a grease
gun. The grease fitting
should then be removed
and the plug reinstalled.
6. Lubricate No. 1 and No. 2 axle
trunnion bearings with GAA.
(WP 0154, Table 8)
TM 9-2320-435-10
0152
0152-9


Back to Top