TM-9-2320-435-10

TRUCK, COMMON BRIDGE TRANSPORT (CBT), 8X8, M1977

TECHNICAL MANUAL; OPERATOR'S MANUAL

JUNE 2009

  TM-9-2320-435-10 - Page 374 of 1168

HIGH-BANK LAUNCH OF BRIDGE BAY - Continued
57.
Position HOOK ARM switch (20) to UNLOAD and release when winch cable hook is
about 5 ft. (1.5 m) above the ground.
58.
Set HIGH IDLE switch (19) to OFF position.
59.
Remove lifting sling (27) from snatch block (26) hook.
60.
Return lifting sling (27) to stowage.
61.
Remove snatch block (26) and extension assembly (25) from winch frame:
a.
Remove snatch block (26) from winch cable (24).
b.
Remove winch cable (24) from extension assembly (25).
c.
Remove extension assembly (25) from winch frame.
d.
Return snatch block (26) and extension assembly (25) to stowage.
62.
Position WINCH switch (21) to IN.
WARNING
Always wear protective gloves when handling winch cable. Never let
cable run through hands. Frayed cables can cut severely. Failure to
comply may result in injury or death to personnel.
Never operate winch with less than five wraps of cable on winch
drum. Failure to comply may result in injury or death to personnel.
63.
While assistant maintains tension on winch cable, release WINCH switch (21) when
hook holder (28) is in saddle (29).
64.
Position MAIN FRAME switch (22) to LOAD and release when main frame is fully
stowed.
65.
Position HOOK ARM switch (20) to LOAD and release when hook arm is fully stowed.
66.
Set PTO ENGAGE switch (13) to OFF position. Indicator light (14) will go out.
TM 9-2320-435-10
0046
0046-22


Back to Top