TM 9-2320-440-13&P
0050-15
0050
46
Weekly
Stowage Box
(BII)
Check BII stowage box (1) for missing hardware
and other obvious damage.
47
Check inside BII stowage box for torn or damaged
seals, water
48
Monthly
Lift Hook Arm
Lubricate lift hook arm (2) with GAA grease.
49
Monthly
Hook Arm
Cylinder Pivots
(Front)
Lubricate both hook arm cylinder pivots (3) with
GAA grease.
Table 1.
Preventive Maintenance Checks and Services (Before). (Continued)
Item
No.
Interval
Item To Be
Checked Or
Serviced
Crewmember
Procedure
Not Fully Mission
Capable if: