10.
Deploy outriggers (WP 0013).
11.
Verify air bag pressure depleted light (6) is illuminated (may take over 2 minutes).
12.
Verify umbilical cables and ADU/IL cables are properly connected to MRP (Refer to THAAD Launcher
IETM).
13.
Stow MRP under-run bumper (Refer to THAAD Launcher IETM).
14.
Disengage MRP deck-to-subframe lock (Refer to THAAD Launcher IETM).
15.
Engage MRP rack locks (WP 0012).
16.
Verify MRP rack locks engaged and light is illuminated (7).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
CAUTION
MRP deck elevation cylinder locks must engage when the elevation angle is greater
than 5°. Verify that deck elevation cylinders and MRP deck cylinder locks have
properly engaged. Failure to comply may result in damage to equipment.
NOTE
Positioning of MRP lift lever controls speed that MRP raises. For fastest deployment,
move lever fully toward RAISE.
Engine will automatically increase to high idle as the MRP is raised above 5º.
17.
Push and hold palm button switch (8).
18.
Move MRP lift lever control (9) to RAISE position until deck elevation cylinders (10) stop.
19.
Release palm button switch (8).
20.
Soldier A and Soldier B deploy blast deflector (Refer to THAAD Launcher IETM).
END OF TASK
THAAD0196