TM-9-2320-440-13-P

TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) CARRIER

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2010

  TM-9-2320-440-13-P - Page 759 of 1616

TM 9-2320-440-13&P
0097-13/(14 blank)
0097
FOLLOW-ON MAINTENANCE
1.
Install air reservoir No. 2 TM 9-2320-325-14&P.
2.
Install fuel sending units (WP 0115).
3.
Fill fuel tank (
4.
Check fuel tank and connections for leaks.
5.
Remove wheel chocks (
END OF TASK
END OF WORK PACKAGE
TM 9-2320-347-10)
TM 9-2320-347-10)


Back to Top