TM-9-2330-227-14-P

SEMITRAILER, VAN: SHOP, 6-TON, SINGLE AXLE, M146

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

JUNE 1985

  TM-9-2330-227-14-P - Page 43 of 576

TM 9-2330-227-14&P
OPERATOR/CREW Preventive Maintenance CHECKS AND SERVlCES (PMCS) - CONTINUED
B
- BEFORE
D - DURING
A - AFTER
W - WEEKLY
ITEM
NO.
8
INTERVAL
B
D
Ž
A
W
ITEM TO BE INSPECTED
PROCEDURE: CHECK FOR AND
HAVE REPAIRED, FILLED, OR
ADJUSTED AS NEEDED
LANDING GEAR
a.
b.
c.
Couple semitrailer to towing
vehicle, and inspect crank gear-
box (3) and shoes (4) for
secure mounting or damage.
Check that crank stow bracket (5)
holds crank (6) securely.
When cranking landing gear,
check both sides to make sure
right and left legs (7) move.
Check at both high and low speed
cranking. Pull out for low
speed, and push in for high.
EQUIPMENT IS NOT
READY/AVAILABLE IF:
Damage is evident that
would affect safe
operation.
Landing gear does not
operate.
2-17


Back to Top