TM-9-2330-238-14

CHASSIS, SEMITRAILER: 6-TON, 4-WHEEL M295A1; SEMITRAILER, VAN: EXPANSIBLE, 6-TON, 4-WHEEL M313; SEMITRAILER, VAN: SHOP, FOLDING SIDES, 6-TON, 4-WHEEL M447 AND M447C; SEMITRAILER, VAN: REPAIR PARTS, SHOP EQUIPMENT, 6-TON, 4-WHEEL M749; SEMITRAILER, VAN: REPAIR PARTS STORAGE, 6-TON, 4-WHEEL M750

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL

JULY 1992

  TM-9-2330-238-14 - Page 222 of 462

TM 9-2330-238-14
4-58. SPLASHGUARD REPLACEMENT (Con’t).
d. REAR SPLASHGUARD INSTALLATION (ALL MODELS EXCEPT M313) I
Position splashguard (15) and retainer (16) in place on semitrailer and secure with five capscrews (14), new
Iockwashers (17), and nuts (18).
I
e.
REAR SPLASHGUARD REMOVAL (M313) I
1.
Remove two capscrews (27) and nuts (30) from straps (23 and 24), retainer (21), and splashguards (19 and 28).
2.
Remove eight capscrews (22), nuts (20), retainer (21) and splashguard (28) from splashguard (19).
3.
Remove three screws (31) and splashguard (19) from semitrailer.
NOTE
For left side rear splashguards, perform step 4. For right side rear splashguards
perform step 5.
4.
Remove grommet (29) from splashguard (19).
5.
Remove two nuts (26), Iockwashers (25) and straps (23 and 24) from semitrailer. Discard Iockwashers.
f. REAR SPLASHGUARD INSTALLATION (M313) I
NOTE
For left side rear splashguards, perform step 1. For right side rear splashguards
perform step 2.
1.
Install two straps (23 and 24) to semitrailer with two nuts (26) and new lockwashers (25).
2.
Install grommet (29) in splashguard (19).
TA702012
4-124


Back to Top