TM-9-2330-238-14

CHASSIS, SEMITRAILER: 6-TON, 4-WHEEL M295A1; SEMITRAILER, VAN: EXPANSIBLE, 6-TON, 4-WHEEL M313; SEMITRAILER, VAN: SHOP, FOLDING SIDES, 6-TON, 4-WHEEL M447 AND M447C; SEMITRAILER, VAN: REPAIR PARTS, SHOP EQUIPMENT, 6-TON, 4-WHEEL M749; SEMITRAILER, VAN: REPAIR PARTS STORAGE, 6-TON, 4-WHEEL M750

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL

JULY 1992

  TM-9-2330-238-14 - Page 226 of 462

4-128
TM 9-2330-238-14
4-59. CABLE REEL MAINTENANCE (ALL MODELS EXCEPT M749) (Con’t).
e.
INSTALLATION
1.
Position cable reel mounting bracket assembly (7) in place on
capscrews (20), new Iockwashers (18), and nuts (19).
semitrailer with mounting hole alined. Install six
2.
Position cotter pin retaining chain (5) in place on cable reel mounting bracket assembly(7) and install screw(4),
washer (3), and new self-locking nut (2).
3.
Position cable reel assembly (13) in place on cable reel mounting bracket assembly (7) and install four
capscrews (1), new lockwashers (16), and nuts (15).
TA702015


Back to Top