TM 9-2330-247-14&P
Table 2-1. Operator/Crew Preventive Maintenance Checks and Services (PMCS) (Con’t).
B-Before
D-During
A-Alter
W-Weekly
INTERVAL
ITEM TO BE INSPECTED
ITEM
PROCEDURE: CHECK FOR AND HAVE REPAIRED,
EQUIPMENT IS NOT
NO.
B
D
A
W
FILLED OR ADJUSTED AS NEEDED.
READY/AVAILABLE IF:
3
ELECTRICAL CONNECTION AND WIRING
a. Inspect connector (1) for damage. Inspect insert for
signs of deterioration or arcing. Inspect contacts
for dirt, bends, burns, or other damage.
b. Inspect chassis wiring harness, clips (4), and
shells (5) for correct assembly and good condition.
NOTE
Perform the following checks/services
AFTER coupling trailer to towing vehicle.
4
HANDBRAKES
With trailer coupled to towing vehicle and handbrakes
Handbrakes fail to operate or do
applied, move trailer slightly to see if handbrakes hold
not hold wheels.
the wheels. If not, adjust handbrake levers (para 3-7).
5
WHEELS
Check wheels for damage. Check wheel stud nuts and
One wheel damaged. One or
hubcap screws for tightness and presence.
more wheel stud nut missing.
TA701031
2-6