TM 9-2330-330-14&P
0043 00-5
ORGANIZATIONAL PREVENTIVE MAINTENANCE
CHECKS AND SERVICES (PMCS)—Continued
0043 00
Table 1. Organizational PMCS—Continued.
ITEM NO.
INTERVAL
ITEM TO BE
INSPECTED
PROCEDURE
NOT FULLY
MISSION
CAPABLE IF:
5
6
Semiannual
Semiannual
Landing Gear
Bogie Assembly
Check condition and operation of
landing gear. Inspect for damage
or wear. Replace damaged parts
(refer to WP 0084 00).
a.
Position semitrailer on hard
level surface with front
resting on landing gear.
Jack and block frame.
Remove wheel assemblies
(refer to WP 0007 00).
NOTE
Clean axle and suspension
system with water and fiber
brush to allow for careful
inspection.
b.
Inspect general condition of
trunnion tube, axles, and
leaf springs. Look for cracks
or damage. If cracked or
damaged, notify Direct
Support maintenance.
Any cracks or
damage are
evident.
c.
Check tightness of U-bolts
and clips on leaf springs.
Tighten loose U-bolts and
clips. If damage or wear is
evident, notify Direct
Support maintenance.
d.
Check tightness of U-bolts
and screws on leaf spring
cap and seat. Tighten loose
U-bolts and screws. If
damage or wear is evident,
notify Direct Support
maintenance.
Any damage or
wear is evident.
Any damage or
wear is evident.