TM-9-2330-330-14-P

SEMITRAILER, FUEL TANKER: 5000-GALLON, FUEL-DISPENSING, AUTOMOTIVE, M969A3

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

NOVEMBER 2005

  TM-9-2330-330-14-P - Page 600 of 1116

TM 9-2330-330-14&P
0134 00-2
BOTTOM LOADING VALVE REPLACEMENT—Continued
0134 00
Curbside Bottom Loading Valve
1.
Remove two screws (4) and brake interlock valve (5) from top of curbside bottom loading valve (6).
2.
Remove 8 self-locking nuts (7), 16 washers (8), 8 bolts (9), and bottom loading valve (6), and
gasket (10) from pipe (11). Discard self-locking nuts and gasket.


Back to Top