TM-9-2330-330-14-P

SEMITRAILER, FUEL TANKER: 5000-GALLON, FUEL-DISPENSING, AUTOMOTIVE, M969A3

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

NOVEMBER 2005

  TM-9-2330-330-14-P - Page 745 of 1116

TM 9-2330-330-14&P
0166 00-1
F, E, AND B VALVES REPAIR
0166 00
THIS WP COVERS:
Disassembly, Cleaning and Inspection, Assembly, Follow-On Tasks
INITIAL SETUP:
Maintenance Level
Tools and Special Tools
Direct and General Support
Tool kit, general mechanic’s (item 4, WP 0171 00)
Materials/Parts Equipment
Conditions
Compound, cleaning (item 4, WP 0174 00)
Rags (item 11, WP 0174 00)
Semitrailer disconnected from prime mover (refer
to WP 0007 00)
Gaskets (3) (item 52, WP 0175 00)
Semitrailer grounded (refer to WP 0007 00)
Lockwashers (48) (item 40, WP 0175 00)
F, E, and B valves removed (refer to WP 0132 00)
Packings (3) (item 51, WP 0175 00)
NOTE
Use this task to repair the F, E, and B valves. The F valve
is shown.


Back to Top