TM-9-2330-331-14-P

SEMITRAILER, FLATBED: BREAKBULK/CONTAINER TRANSPORTER, 34 TON, M872A4

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL WITH REPAIR PARTS AND SPECIAL TOOLS LISTS

DECEMBER 2005

  TM-9-2330-331-14-P - Page 186 of 472

TM 9-2330-331-14&P
0033 00
SIDE CLEARANCE LIGHT WIRING HARNESS REPLACEMENT-Continued
SIDE CLEARANCE LIGHT WIRING HARNESS INSTALLATION
1
1
2
Figure 8. Side Clearance Light Wiring Harness
NOTE
See charts in WP 0025 00-3 for details on wiring diagram.
1. Install new grommets as needed.
2. Install side clearance light wiring harness (1) to frame.
NOTE
Apply dielectric grease to each plug before connecting to other
cables and harnesses.
3. Connect side clearance light wiring harness (1) to main wiring harness (2).
4. Install side clearance light per WP 0030 00-3.
5. Connect to prime mover and check all lights for correct operation.
0033 00-10


Back to Top