I
TM 9-2330-331-14&P
0034 00
SERVICE BRAKES - SHOES AND LINING MAINTENANCE
INITIAL SETUP:
Equipment Conditions
• Ground Boards Emplaced
• Landing Legs Down
• Tires Chocked
• Semitrailer Disconnected from Prime Mover
• Tires and Wheels Removed (WP 0016 00-2)
• Brake Drum Removed (WP 0036 00-2)
Tools/Test Equipment
• General Mechanic’s Tool kit (WP 0077 00-9)
• Jack Stands
Materials/Parts
• Antiseize Compound (WP 0086 00-2)
• Grease, GAA (WP 0086 00-2)
Personnel Required:
• Two