TM 9-2330-331-14&P
0040 00
ABS BRAKE SENSOR AND POWER CONNECTION REPLACEMENT - Continued
FOLLOW-ON TASKS
•
Install brake drum (WP 0036 00-2).
•
Connect semitrailer to prime mover.
•
Raise landing legs.
•
Remove/store chocks and ground boards.
•
Verify proper/safe operation.
END OF WORK PACKAGE
0040 00-3/4 Blank