TM-9-2330-331-14-P

SEMITRAILER, FLATBED: BREAKBULK/CONTAINER TRANSPORTER, 34 TON, M872A4

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL WITH REPAIR PARTS AND SPECIAL TOOLS LISTS

DECEMBER 2005

  TM-9-2330-331-14-P - Page 218 of 472

TM 9-2330-331-14&P
0041 00
AIR LINE REPLACEMENT - Continued
REMOVAL
Remove hose ties and hose clamps as necessary.
INSTALLATION
1. Treat all threads with sealing compound (sealant, silicone) before replacing.
2. Install hose clamps and hose ties as necessary.
FOLLOW-ON TASKS
Connect semitrailer to prime mover.
Raise landing legs.
Remove/store chocks and ground boards.
Pressurize system and check for leaks (WP 0044 00-1).
Verify proper/safe operation.
END OF WORK PACKAGE
0041 00-2
0037 00-2


Back to Top