TM 9-2330-331-14&P
0050 00
TIEDOWN RINGS REPLACEMENT
INITIAL SETUP:
Equipment Conditions
Materials/Parts
•
Ground Boards Emplaced
•
Oil, Lubricating (WP 0086 00-2, Item 9)
•
Landing Legs Down
•
Cotter Pin (WP 0080 00-37)
•
Tires Chocked
•
Semitrailer Disconnected from Prime Mover
Tools/Test Equipment
•
General Mechanic’s Tool Kit (WP 0077 00-9)
CAUTION
Replace damaged/deformed D-Rings.
NOTE
All tiedown rings are removed and installed the same way.
This procedure covers
one tiedown ring.
REMOVAL
Remove cotter pin (4), nut (3), bolt (7), sleeve (6), upper ring (5), and lower ring (2) from deck pinning (1).
Discard cotter pin.
7
6
1
5
3
2
4
Figure 1. Tiedown Rings
0050 00-1