TM-9-2330-331-14-P

SEMITRAILER, FLATBED: BREAKBULK/CONTAINER TRANSPORTER, 34 TON, M872A4

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL WITH REPAIR PARTS AND SPECIAL TOOLS LISTS

DECEMBER 2005

  TM-9-2330-331-14-P - Page 245 of 472

TM 9-2330-331-14&P
0051 00
SPARE TIRE HOIST REPLACEMENT
INITIAL SETUP
Equipment Condition
Tools/Test Eqipment
• Ground Boards Emplaced
• General Mechanic’s Tool Kit (WP 0077 00-9)
• Landing Legs Down
• Tires Chocked
Materials/Parts
• Semitrailer Disconnected from Prime Mover
• Locknuts (WP 0080 00-26)
• Spare Tire Removed (WP 0016 00-1)
REMOVAL
Remove four locknuts (1), bolts (3), and spare tire hoist (2). Discard locknuts.
1
2
3
Figure 1. Spare Tire Hoist
INSTALLATION
Install spare tire hoist (2) with four bolts (3), and new locknuts (1).
FOLLOW-ON TASKS
Install spare tire (WP 0016 00-5).
END OF WORK PACKAGE
0051 00-1/2 Blank


Back to Top