TM-9-2330-331-14-P

SEMITRAILER, FLATBED: BREAKBULK/CONTAINER TRANSPORTER, 34 TON, M872A4

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL WITH REPAIR PARTS AND SPECIAL TOOLS LISTS

DECEMBER 2005

  TM-9-2330-331-14-P - Page 260 of 472

INSTALLATION
1.
Install radius rod (3) on axle brackets (1 and 4) with two bolts (2), washers (5), and new locknuts (6).
2.
Torque all fasteners according to WP 0016 00-4.
Figure 1.
Radius Rods
FOLLOW-ON TASKS
• Align axle (WP 0071 00-3).
END OF WORK PACKAGE
0057 00-2
TM 9-2330-331-14&P
0057 00
RADIUS RODS REPLACEMENT - Continued


Back to Top