TM 9-2330-331-14&P
0061 00
FLOOR DECK BOARDS REPLACEMENT
INITIAL SETUP:
Equipment Conditions
•
Ground Boards Emplaced
•
Landing Legs Down
•
Tires Chocked
•
Semitrailer Disconnected from Prime Mover
Tools/Test Equipment
•
General Mechanic’s Tool Kit (WP 0077 00-9)
•
Common No. 1 Tool Kit (WP 0077 00-9)
Materials/Parts
•
Screws (WP 0080 00-19)
NOTE
•
Measure board width and length to ensure proper replacement board.
•
Deck screws must be ordered separately, they are not part of a kit.
•
Procedures are for single board replacement. Follow the same
procedures for every board replaced.
REMOVAL
Remove screws (1) from floor board (2) being replaced and remove floor board (2)
from semitrailer.
Discard screws.
1
2
2
2
Figure 1. Floor Deck Boards
0061 00-1