TM 9-2330-331-14&P
0073 00
SUSPENSION MAINTENANCE
INITIAL SETUP:
Equipment Conditions
Materials/Parts
•
Trunnion Bushing Removed (equalizing beam
•
Dry Cleaning Solvent (WP 0086 00-3)
removal only) (WP 0047 00-1)
•
Locknuts (WP 0080 00-28)
•
Nut, Plain, Extended Washer (WP 0080 00-29)
Tools/Test Equipment
Personnel
•
General Mechanic’s Tool Kit (WP 0077 00-9)
•
Two
•
Common No. 1 Tool Kit (WP 0077 00-9)
REMOVAL
1. Remove two Iocknuts (8) and screws (7) from springs (3) and equalizing beam (6). Discard locknuts.
2.
Remove flange nuts (nut, plain, extended washer) (5), spring seat (4), axle seat (2), and U-bolts (1).
Discard flange nuts.
3. Remove springs (3) and equalizing beam (6) from semitrailer.