TM-9-2330-334-13-P

FAMILY OF MEDIUM TACTICAL VEHICLES (FMTV) LOAD HANDLING SYSTEM TRAILER (LHST) M1147A1

TECHNICAL MANUAL; OPERATOR AND FIELD LEVEL MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST (RPSTL)

DECEMBER 2013
CHANGE 1

  TM-9-2330-334-13-P - Page 395 of 1184

TM 9-2330-334-13&P
STACKING TRAILER/PREPARATION FOR TRANSPORT
0056 00
0056 00-1
Change 1
THIS WORK PACKAGE COVERS:
Stacking Trailer, Preparation for Transport
INITIAL SETUP:
Maintenance Level
Field
Tools and Special Tools
Took Kit, Genl Mech (Item 24, WP 0167 00)
Wrench, Torque 50-250 lb-ft (Item 33,
WP 0167 00)
Materials/Parts
Lockwashers (6) (Item 18, WP 0168 00)
Chains (15) (NSN 4010-01-371-5772)
Binder, Load (8) (NSN 3990-01-440-5975)
Equipment Conditions
Trailer uncoupled (TM 9-2320-392-1)
Flatrack rail in down position (WP 0005 00)
References
TM 9-2320-392-10-1
GENERAL
This work package contains information and instructions to stack and transport the Load Handling System
Trailer (LHST).
WARNING
Wear appropriate eye protection when working under trailer due to the
possibility of falling debris. Failure to comply may result in injury to personnel.
CAUTION
Front guides must be properly stored on both LH and RH sides of the trailer to
meet with transport width requirements. Failure to comply may result in damage
to equipment.
Trailer must be unloaded of all containers and cargo.
Failure to comply may
result in damage to equipment.
NOTE
Lug wrench to remove stacking brackets and shuttle guide brackets included in
trailer stowage box.
Combine securing chains as needed to achieve desired lengths.


Back to Top