TM 9-2330-334-13&P
JUNCTION BOX REPLACEMENT
0059 00
0059 00-1
Change 1
THIS WORK PACKAGE COVERS:
Removal, Installation, Operational Checks
INITIAL SETUP:
Maintenance Level
Field
Tools and Special Tools
Tool Kit, Genl Mech (Item 24, WP 0167 00)
Goggles, Industrial (Item 8, WP 0167 00)
Wrench, Torque, 0-200 lb-in. (Item 35,
WP 0167 00)
Materials/Parts
Ties, Cable, Plastic (Item 19, WP 0165 00)
Materials/Parts (Cont)
Dispenser, Pressure Sensitive Adhesive Tape
(Item 6, WP 0165 00)
Washer, Lock (9) (Item 9, WP 0168 00)
Nut, Self-Locking (2) (Item 27, WP 0168 00)
Equipment Conditions
Trailer uncoupled (WP 0043 24,
TM 2320-392-10-1)
GENERAL
This work package contains information and instructions to replace the Load Handling System Trailer (LHST)
junction box.
WARNING
Wear appropriate eye protection when working under trailer due to the
possibility of falling debris. Failure to comply may result in injury to personnel.