TM 9-2330-334-13&P
DRAWBAR LIFT VALVE REPLACEMENT - Continued
0094 00
Change 1
0094 00-6
INSTALLATION – Continued
9.
Connect hose (3) to fitting (4).
10.
Connect two hoses (1) to 90-degree fittings (2).
OPERATIONAL CHECKS
1.
Couple trailer (WP 0043 23, TM 2320-392-10-1, Coupling Trailer).
2.
Operate drawbar lift valve.
3.
Check for leaks in drawbar lift valve hoses.
4.
Uncouple trailer (WP 0043 24, TM 2320-392-10-1, Uncoupling Trailer).
END OF WORK PACKAGE