TM 9-2330-334-13&P
TOOLBOX ASSEMBLY REPLACEMENT/REPAIR - Continued
0098 00
0098 00-7/8 Blank
Change 1
INSTALLATION - Continued
6.
Position tool box (4) on trailer chassis (5) with six screws (1), washers (2), and self-locking
nuts (3).
7.
Tighten six self-locking nuts (3) to 92-108 lb-ft (125-146 N·m).