TM 9-2330-334-13&P
FLATRACK LOCK PUSH/PULL VALVE REPLACEMENT - Continued
0108 00
0108 00-7/8 Blank
INSTALLATION - Continued
6.
Install knob (3) on flatrack lock push/pull valve (2).
7.
Tighten nut (1) on flatrack lock push/pull valve (2).
OPERATIONAL CHECKS
1.
Couple trailer (WP 0043 23, TM 2320-392-10-1, Coupling Trailer).
2.
Check flatrack push/pull valve air hoses for leaks.
3.
Check for proper operation of flatrack push/pull valve (WP 0005 00).
4.
Uncouple trailer (WP 0043 24, TM 2320-392-10-1, Uncoupling Trailer).
END OF WORK PACKAGE