Table
1.
OPERATOR'S PMCS - SEMI-ANNUAL - Continued.
ITEM
NO.
INTERVAL
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
Lubricate both ISO locks
(Figure 1, Item 1) with GAA
grease (WP
0060, Table 1,
Item 4, 5, 6, 7, 8). Install ISO
locks on ISO lock bracket
(WP
0024).
1
Figure 1.
PMCS Semi-Annual.
2
Semi-
annual
Cart rollers
(bottom)
Move cart to front of trailer
(WP
0028).
Lubricate both cart rollers
(bottom) (Figure 2, Item 1) with
GAA grease (WP
0060, Table
1, Item 4, 5, 6, 7, 8).
TM 9-2330-342-10
0053
0053-2