OPERATOR MAINTENANCE
OPERATOR'S PMCS - WEEKLY
INITIAL SETUP:
References
WP
0054
Table
1.
OPERATOR'S PMCS - WEEKLY.
ITEM
NO.
INTERVAL
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
1
Weekly
Frame
Walk around trailer and visually
inspect for obvious damage to
trailer frame (Figure 1, Item 1)
and stowage box (Figure 1,
Item 2).
Trailer has damage to
frame that would impair
operation.
2
1
Figure 1.
PMCS Weekly.
2
Weekly
Shock Absorbers
Visually check shock absorbers
(Figure 2, Item 1) for leaks or
obvious damage.
Damage to shock
absorbers that would
impair operation.
TM 9-2330-342-10
0051
0051-1