Table
1.
OPERATOR'S PMCS - AFTER - Continued.
ITEM
NO.
INTERVAL
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
1
3
TRAJECTORY
2
Figure 3.
PMCS After.
Check for missing, cracked,
and broken studs (Figure 3,
Item 2) and lugnuts (Figure 3,
Item 3).
One or more studs or
lugnuts are missing
from spare tire.
8
After
Air Reservoirs
Pull cable (Figure 4, Item 1) on
all three air reservoirs and
observe air stream for presence
of moisture.
Drain air until only air comes
out.