TM-9-2330-342-10

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; OPERATOR'S MANUAL

SEPTEMBER 2012

  TM-9-2330-342-10 - Page 51 of 500

LIST OF ABBREVIATIONS - Continued
Table
2.
List of Abbreviations - Continued.
PLST
Palletized Load System Trailer
PMCS
Preventive Maintenance Checks and
Services
PR
Pair
psi
Pounds Per Square Inch
QTY
Quantity
RPM
Revolutions Per Minute
TAMMS
The Army Maintenance Management
System
TDA
Tables of Distribution and Allowance
TM
Technical Manual
U/I
Unit Of Issue
UV
Ultraviolet
SAFETY, CARE, AND HANDLING
Beware of payload movement during normal loading/unloading operations. Ensure tiedown
straps and cargo net are correctly installed. Flatrack should be loaded on vehicle or trailer
using Load Handling System (LHS), Material Handling Crane (MHC), or other suitable lifting
device. Never walk under flatrack while it is being lifted, loaded, or unloaded.
For M1 flatrack, ensure sideboard kit is also correctly installed. The M1 flatrack should be
loaded on vehicle or trailer using Load Handling System (LHS). M1 flatracks should be
stacked using a forklift. When lifting loaded M1 flatrack, the forklift pockets located nearest
the ends of the M1 flatrack must be used.
When loading/unloading container on trailer using cart, ensure cart container locks are
properly secured and ISO locks and pins are properly installed. When loading/unloading
container on trailer using cart, use a Load Handling System (LHS) with either a Container
Handling Unit (CHU) or Enhanced Container Handling Unit (ECHU) without a flatrack.
END OF WORK PACKAGE
TM 9-2330-342-10
0001
0001-5/6 blank


Back to Top