TM-9-2350-238-34-2

CRANE (CAB) COMPONENTS, RECOVERY VEHICLE, FULL TRACKED: LIGHT, ARMORED, M578

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL

APRIL 1992

  TM-9-2350-238-34-2 - Page 295 of 327

TM 9-2350-238-34-2
2-51. MAINTENANCE OF TURRET BEARING INSTALLATION–PLAIN BEARING UNIT
AND OUTER RACE ASSEMBLY (CONT).
INSTALLATION (CONT)
2
3
4
6
Install two fabricated alinement pins (fig.
1, appx C) in threaded holes in outer
race (3). Alinement pins should be 180
degrees apart.
Aline scribe mark and install cab (1) on
plain bearing unit (2).
Position cab assembly (1) over plain
bearing unit (2) and lower cab assembly
into place.
Coat threads of 28 hexagon head capscrews
(4) with sealing compound (item 18, appx B)
and, using torque wrench, install 28 new
Iockwashers (5), and 28 hexagon head
capscrews (4) securing plain bearing (2) to
cab (1). Torque hexagon head capscrews (4)
to 200-215 ft-lb (270-290 N-m) dry or 140-
150 ft-lb (189-203 N-m) lubricated.
Remove alinement pins.
5
Section V. PREPARATION FOR STORAGE OR SHIPMENT
Refer to TM 9-2350 -238-20-2 for detailed preparation for storage or shipment.
2-282
Change 1


Back to Top