ASSEMBLY AND PREPARATION FOR USE
INITIAL SETUP:
References
Components of End Items (COEI) and Basic
Issue Items (BII) lists (WP 0132)
DA Form 5988-E (WP 0131)
Preventive Maintenance Checks and Services
(PMCS) – after, including lubrication
instructions (WP 0098)
Preventive Maintenance Checks and Services
(PMCS) – before, including lubrication
instructions (WP 0096)
References (cont.)
Preventive Maintenance Checks and Services
(PMCS) – during, including lubrication
instructions (WP 0097)
Stowage and decal/data plate guide (WP 0065)
TM 9-2350-256-10 HR (WP 0131)
PREPARATION FOR USE
When a new vehicle is received by the unit, it must be thoroughly inspected. If there are any discrepancies with
the vehicle, record it on DA Form 5988-E (WP 0131). Check the vehicle for completeness of assembly. Make sure
that all equipment and controls are present and in good shape. Check the Components of End Item (COEI) and
Basic Issue Items (BII) against the COEI and BII lists (WP 0132) and TM 9-2350-256-10 HR (WP 0131) to be
sure they are all present. Stow all COEI and BII in their designated stowage locations (WP 0065).
END OF TASK
INITIAL ADJUSTMENTS, CHECKS, AND SELF
−
TEST
Perform all BEFORE (WP 0096), DURING (WP 0097), and AFTER (WP 0098) operation checks and services in
the Preventive Maintenance Checks and Services (PMCS).
END OF TASK
END OF WORK PACKAGE
TM 9-2350-256-10
0008
0008-1/blank