TM-9-2350-256-20-2

RECOVERY VEHICLE, FULL TRACKED: MEDIUM, M88A1

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL VOLUME 2 OF 2

JUNE 2005

  TM-9-2350-256-20-2 - Page 39 of 1440

TM 9-2350-256-20-2
0151 00
UNIT MAINTENANCE
RECOVERY VEHICLE, FULL TRACKED: MEDIUM, M88A1
NSN 2350-00-122-6826, EIC AQA
MASTER RELAY HOUSING (DUAL AND SINGLE VOLTAGE) REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Tool kit, general mechanic’s (item 59, WP 0490 00)
Materials/Parts
Bolts (2) (item 382, WP 0491 00)
Drivescrews (2) (item 499, WP 0491 00)
Lockwashers (4) (item 614, WP 0491 00)
Nuts (2) (item 696, WP 0491 00)
Equipment Condition
Grille removed (see WP 0300 00)
Battery ground cables disconnected (see WP 0153 00)
WARNING
Be certain MASTER switch is OFF when working on electrical system to avoid electrical shock and
burns.
Removal
1.
Disconnect three connectors (1).
2.
Remove master relay (2) by removing two bolts (3), two nuts (4), four lockwashers (5), and two sleeve spacers (6).
3.
Remove ID plate (7) by removing two drivescrews (8).
0151 00-1


Back to Top