TM-9-2350-256-20-2

RECOVERY VEHICLE, FULL TRACKED: MEDIUM, M88A1

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL VOLUME 2 OF 2

JUNE 2005

  TM-9-2350-256-20-2 - Page 506 of 1440

TM 9-2350-256-20-2
0273 00
7.
Install 19 self-locking bolts (9). Torque self-locking bolts to 337–385 lb-ft (457–522 N•m).
8.
Remove two jackscrews (10).
9.
Remove wooden block (8).
10.
Connect brake rod (6) using straight pin (5) and cotter pin (4).
11.
Install lubrication fitting (7), if necessary.
NOTE
Output reduction drive alignment ring (3) is installed in right-side output reduction drive (2) only.
12.
Install output reduction drive alignment ring (3) in output reduction drive (2).
13.
Install drive coupling (1) on output reduction drive (2).
NOTE
Follow-on maintenance: Install final drive hub and sprockets (see WP 0283 00); Install powerplant (see
WP 0098 00).
END OF WORK PACKAGE
0273 00-4


Back to Top