TM-9-2350-256-20-2

RECOVERY VEHICLE, FULL TRACKED: MEDIUM, M88A1

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL VOLUME 2 OF 2

JUNE 2005

  TM-9-2350-256-20-2 - Page 696 of 1440

TM 9-2350-256-20-2
0329 00
Installation
1.
Install boom support (12) with 16 flat washers (15), 8 lockwashers (14), and 8 screws (13). Torque screws to 70–75
pound-feet (lb-ft) (95–102 newton-meters [N•m] ).
2.
Install three springs (9) and three latches (8) with three straight pins (11) and six cotter pins (10).
3.
Install latch adjusting screw (6) and nut (7).
4.
Install spring (2) and support latch (1) with washer (4), straight pin (5), and cotter pin (3).
Adjustment
1.
Place boom on boom support (12). Loosen nut (7) and adjust latch adjusting screw (6) until support latch (1) is fully
engaged. Tighten nut.
NOTE
Follow-on maintenance: Lower hoisting boom (refer to TM 9-2350-256-10).
END OF WORK PACKAGE
0329 00-2