TM 9-2350-256-34
0068 00
Installation
WARNING
Tie end of stayline cable assemblies (12) to hoisting boom assembly (18) to avoid injury to personnel.
1.
Attach sling to hoisting boom assembly (18) as near as possible to its balance points.
2.
Using sling, move hoisting boom assembly (18) into position.