TM 9-2350-261-10
SET UP COMMAND POST TENT (COVERED EXTENSION) (M577A2 ONLY) — Continued
0054 00
15. Zip fastener and tie curtain under carrier.
16. Drive 34 staking pins through 34 footstops.
17. Drive eight staking pins for guy lines.
18. Secure and tighten guy lines.
19. Tie tapes around frame assembly legs.
20. Tie stowage cover to top edge of carrier and to sides of tent.
21. Unlock and lower ramp to ground (WP 0015 00).
22. Install electric light assembly and secure with tie.
23. Connect light assembly to one of two utility outlets on either side of ramp.
24. Secure eight straps inside enclosure, along junction of top and side, to frame.
ADD ADDITIONAL TENTS
NOTE
Many additional tents may be erected and attached as required for tactical operation.
1.
Align and erect additional tents to any of three entrances of previously erected tent.
0054 00-4