TM 9-2350-273-BD
TRACK AND SUSPENSION
Procedural Steps (Cont'd)
4. Hold wedging material in place with pole.
5. Move vehicle slowly so wedging material will move with the wheel and lift track off
wheel.
6. Using tanker's bar, pry track in place.
If tanker’s bar is not available, move vehicle
back and forth about a foot. Track should straighten itself out. Lateral steering may
be applied to put a side load on the track.
7. Remove wedging material and readjust track tension.
8. Record the BDAR action taken.
When the mission is completed, as soon as
practicable, repair tank using standard maintenance procedures.
9-6. TRACK WEDGE LOST
General Information:
The wedge holds the end connector on the track shoe pins. If the end connector comes
off, the track will come apart.
Close inspection is required to find a missing wedge.
Perform this procedure only if a replacement wedge cannot be found.
Limitations
●
None
Personnel/Time Required
●
2 soldiers
●
30 minutes
Materials/Tools
●
Welding equipment
●
3/4 Inch bar steel stock or equivalent
Procedural Steps:
Option 1:
1. Drive end connectors in place
with hammer.
2. Weld bar stock to end of track shoe
pins as shown.
Option 2:
1. Release track tension.
2. Remove one track shoe.
9-4