TM-9-2350-275-BD

M113 FAMILY CARRIER, PERSONNEL SELF-PROPELLED FULL-TRACKED

TECHNICAL MANUAL; OPERATORS, ORGANIZATIONAL, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE; BATTLEFIELD DAMAGE ASSESSMENT AND REPAIR

  TM-9-2350-275-BD - Page 72 of 223

TM
9-2350-275-BD
COOLING SYSTEM
Procedural Steps (Cont):
8.
Re-install fan tower belts.
9.
Close engine compartment panels.
10. Record the BDAR action taken. When the mission is completed, as soon as
practicable, repair the vehicle using standard maintenance procedures.
5-7. V-BELT, MISSING OR BROKEN
General Information:
Vehicle cooling and charging systems inoperable due to missing or broken V-belts.
Limitations:
None
If rope or wire is used, check tension frequently
Personnel/Time Required:
1 soldier
10 to 60 minutes
Materials/Tools:
Adjustable link belting
Rope, 3/8 inch to 1/2 inch
Communication wire
Other Options
For multibelt systems, use one belt from a comparable vehicle
Procedural Steps:
Option 1.
Adjustable Link Belt.
1. Loosen belt adjustment to allow for smallest possible belt length.
2. Assemble belt links to obtain a belt length as close as possible to the original belt
length. Care must be exercised that the belt be put on with the belt taper going in the
direction of puny rotation.
This prevents undue strain on the belt links.
3. Readjust belt tensioner.
5-5


Back to Top