TM 9-2350-277-10
BREAK/JOIN T130 TRACK
0092 00
THIS WORK PACKAGE COVERS:
Break Track (page 0092 00-1).
Join Track (page 0092 00-5).
INITIAL SETUP:
Maintenance Level
Operator
Tools and Special Tools
C row bar ( WP 0 102 0 0, Table
2
, Item 13)
D rive Pin Pu nch (W P 01 02 00 , Tab le
2
, Item 4 4)
G rease G un (WP 010 2 00, Table
2
, Item 25, Item 25 )
Hamm er, 2 lb (W P 0102 00, Table
2
, Item 26) or
Hammer, 4 lb (WP 0103 00)
Adjustable Wrench, 1-5/16 inch (WP 0102 00, Table
2
, Item 64)
Socket Handle, 1/2 inch drive (WP 0102 00, Table
2
, Item 30)
Sock et, 1 1/1 6 inch (WP 010 2 00, Table
2
, Item 49)
Track Fixture ( 2) (WP 0 102 0 0, Table
2
, Item 23)
Industrial Goggles (WP 0103 00)
Personnel Required
Driver
Crew
References
WP 0008 00
WP 0021 00
WP 0023 00
WP 0024 00
WP 0042 00
WP 0091 00
Equipment Condition
Engine stopped (WP 0024 00)
BREAK TRACK
1.
Unstow crowbar and track fixtures from rear top deck. Remove industrial goggles and hammer from tool bag.
2.
Start engine (WP 0021 00).
3.
Drive carrier to firm level ground (WP 0023 00).
009200-1
Change 4